Angel Lane

Project details:

Value: £4.1m

Project duration: 22 months

Client: Telford Homes

Plots:


This project based in Stratford for one of our long term clients involved the mechanical distribution and fit out of these highly sought after flats adjacent to Stratford’s Westfield shopping centre. Our supply and installation included the boosted cold water, sub station, BMS control system, LTHW distribution and HIUs. We also installed the heat meters and m-bus system, the wet riser, conventional radiators as well as under floor heating, soils, wastes and all sanitary ware.

As we continue to concentrate on our Key Accounts, we develop better working relationships with them. This allows us to really examine the MEP design work to suggest a variety of value engineering solutions to save the client time and money. We are also able to offer remote monitoring services from an FM perspective to keep a check on how the plant is running and to rectify any potential failures before they happen. 


What our client said:

"Woodford Heating and Energy have continued to show themselves as an essential part of the on-site construction team. They work well with the other trades and the consultants to help build the job to a high standard." Telford Homes